Skip to content
Training stable aisle with a horse, staff member and wireless network equipment

Racing & equine / commercial connectivity

One network.Every working stable.

Internet, building links, stable Wi-Fi and equipment connections. Planned around the people and horses on site.

Work completed for Ciaron Maher Racing at Cranbourne and Ballarat

The working yard

The best network is the one staff can rely on.

A racing centre rarely operates from one building. The office, stable blocks, vet areas and training equipment may all need a connection.

We look at the whole site. Then we choose the right mix of cabling, surveyed radio links and access points.

That gives staff one clear network plan and a practical handover.

01

Bring internet in

Starlink, NBN or a suitable mobile connection. We check the feed before extending it.

02

Link the buildings

Cat6 where a cable route suits. Wireless bridges where a clear surveyed path suits.

03

Serve the work areas

Stable aisles, offices, devices and cameras get the access they need.

Beyond a Wi-Fi signal

Connect the tools behind the training day.

The network may need to carry more than staff phones. Device support depends on each supplier's interface.

Horse treadmills
Approved controllers, monitoring and data access.
Horse weighing scales
Supported scale interfaces and staff tablets.
Tracking and wearables
Vendor gateways and cloud systems where supported.
Race replay and screens
A planned connection for office and review areas.
Cameras and recording
Stable, yard and access views with network separation.
Staff and administration
Phones, tablets, computers and shared work areas.
Equine training equipment area with a treadmill, weighing platform and tablet
We confirm equipment compatibility with the supplier before connecting it.

Completed racing industry work

From Cranbourne to Ballarat.

Two Ciaron Maher Racing sites. Two different approaches to the same goal.

Cranbourne / completed work

Starlink and wireless bridges.

We moved Starlink to Stable 2 and used the existing rack. Radio links connected the entry and other work areas.

See the Cranbourne project

Ballarat / completed work

Cabled links to the buildings.

At Miners Rest we ran conduit and Cat6 to staff accommodation buildings. We later fitted a larger switch and tidied the cabinet.

See the Ballarat project

Free industry service guide

Connectivity for the racing industry.

Twenty pages covering the backbone, stable operations, equipment, security, surveys and our racing projects.

Get the free 20-page guide
Cover of the Vin Connect racing industry service guide

Site survey to handover

Show us the buildings. We'll map the connections.

Start with the stable layout and the systems that matter. We can survey the site and prepare a staged scope.

  1. 01

    Understand the site

    Buildings, existing internet, staff use and equipment interfaces.

  2. 02

    Survey the paths

    Check cable routes, radio links, coverage and power.

  3. 03

    Install in stages

    Agree access times, work areas and any interruptions.

  4. 04

    Test and hand over

    Check the links, document the network and show staff how it works.

Questions racing operators ask.

Can you connect separate stable buildings without trenching?

Often. We survey line of sight, power and mounting positions. A radio bridge can carry the network between suitable buildings.

Can a horse treadmill or weighing scale use the network?

We check the equipment model and its supported interface first. The supplier may need to approve or configure the connection.

Will staff and cameras use the same Wi-Fi?

They can share the site infrastructure with separate access rules. We design and test those rules for the equipment involved.

Can you work around training times?

We agree access, animal movement and any outages before work starts. Installation stages can be planned around the stable routine.

See also our stable Wi-Fi service, wireless links and horse property networks.